Wednesday, 19 March 2014

Basement framing part 2

Went to Lowes and picked up some bluwood studs...about  55 studs all together.  Now I'm ready to start framing the other half of the basement.
Framed the built-in book shelf, the electrical room and started the media closet.


Media Closet

Electrical Room


Built-in Bookshelf

I just have enough to frame the back wall of the work-out area and the area around the window.  Now I have to install a light for the electrical room with a switch.

Having installed a water softener system my wife has been reading that we shouldn't be cooking with or drinking soften water.  We then require a seperate "hard" water line for the fridge, filtered kitchen water, and the front and backyard lines.  So now I have to purchase some PEX line and make a connection to the main before it enter the water softener.

I think I'll make that my next project.